CLICK HERE FOR A MESSAGEFROM THE OWNER»

Concrete Calculators

Concrete Volume
Width (Feet) Length (Feet) Thickness
Inches
Feet
Cubic Yards Required

Volume Calculator

To use the Concrete Volume Calculator, simply enter the width, length, and thickness of your pour, click on whether you are measuring the thickness in feet or inches, then click on the Calculate button. The calculator will estimate the number of cubic yards of concrete that will be required.


Block Wall
Height (Feet) Length (Feet) Block Size
8 inch
12 inch
Cubic Yards Required

Wall Calculator

To use the Block Wall Calculator, simply enter the height and length of the wall, click on whether you are filling an 8-inch or 12-inch wall, then click on the Calculate button. The calculator will estimate the number of cubic yards that will be required. Note that this is an estimate. There is significant variation in fill space among different blocks. This calculator assumes the use of double open-ended bond beam blocks.


Column
Height (Feet) Diameter (Inches)
Cubic Yards Required

Column Calculator

To use the Concrete Column Calculator, simply enter the height and diameter of the column, and click on the Calculate button. The calculator will display the number of cubic yards required.

Munjoy Heights, Portland

2020GrampysEmployeesOfTheForever - Rod & Granddaughter Jordan

Since 1997

Family Owned & Operated

Rod Cummings founded his concrete company as R.A. Cummings, Inc. in 1972. Over the years his children, Joel Cummings, and Lori Gile, took on pivotal roles in the company, and in 1997 Auburn Concrete was born.